Weekly meeting time: Friday 12:30-1:00pm
5/5/24 – Final Hand In
- Recorded final presentation
- Uploaded final architecture diagram
- Updated website with design document info
- Updated website with final presentation links
4/23/24 – Class 15
- Made final end-of-semester to-do list
- Planned dates for any meetings to finish up things
- Discussed anything left to finish and divided up work
4/16/24 – Class 14
- Database connection error fixed
- Main application set up and running
- Discussed closing up the semester and what is left to do with the project
- Went over current bugs that still need to be fixed
4/11/24 – Class 13
- Worked on fixing the Django project structure and removing deprecated features
- Briefly spoke with the client to plan for the rest of the semester
- Also went over team roles and goals for the rest of the semester
4/4/24 – Class 12
- Troubleshooting for running the application (getting UI files corrected, fixing old Python, Django conversion issues)
- Finished planning tech talk
- Discussed plans for the documentation plan and client hand-off plan
3/19/24 – Class 11
- Starting planning tech talk, agreed on preferred date
- Talked about plans for APPLES assignment
- Discussed best way to proceed with current state of code/application
3/7/24 – Tech Talk/Database Restoration Meeting
- Brainstormed and talked about tech talk ideas
- Restored the database from backup file, ran sample query on SSMS
- Installed dependencies/tools to run/work on code
- Looked at early problems in the existing code, started thinking about how to fix
3/5/24 – Class 10
- Discussed changes to architecture diagram
- Went over restoring the database (how to do so)
2/29/24 – Class 9
- Discussed ethics assignment, divided work to complete
- Planned testing database backup
- Went over goals for the next 2 weeks
2/25/24 – Weekend Team Meeting
- Organized and practiced project presentation
- Discussed system architecture and created architecture diagram
- Planned running the code and beginning work on requirements
2/15/24 – Meeting with UNC School of Dentistry IT
- Discuss the situation/issues with the Dentistry School’s database
- Troubleshoot database access problems, let IT know what exactly needs to be done with it
- Work out obtaining access to the Sterilization database so that code can be run
- Discussed platform selection post meeting.
2/9/24 – Coach meeting 2
- Check In on week 1 meeting goals
- Updated Sam on communications with System Admin and that we have access to the repository
- Reviewed deliverables for next ~2 weeks including platform selection and architecture diagram
2/8/24 – Class 8
- Sorted requirements into functional/non functional, definite, perhaps, and improbable
- Received contact info for Dental School systems admin to gain access to data base
- User stories live on website for D1 Deliverables.
2/6/24 – Class 7(No Class Held)
2/2/24 – First meeting with Sam
- Familiarized with course calendar and resource locations
- discussed project timeline
- reviewed website and initial project requirements
1/30/24 – Class 6
- delegated journal entry, project concept, and user stories responsibilities
- reviewed timeline for February
1/29/24 – First Client Meeting
- Met client and scheduled bi-weekly follow-ups
- Discussed requirements and desires for project
- received initial code repository from previous contributors
1/25/24 – No Class Held
1/23/24 – Class 4
- Received project assignment
- Updated website description, tabs, and meeting times
- Reached out to schedule client meeting
- Scheduled coaches meeting
1/18/24 – Class 3
- Decide on project preferences
- Fill out website info
- Email preferences and website link
1/16/24 – Class 2
- Share technical interests and strengths
- Decide on best times for weekly coach meetings
- Begin to create website using UNC WordPress